After the 1998 Flood, the Central Government developed a strategy of "leveling protective embankment to divert water, retreating the land to lakes, and building township for relocated people". 1998年大水后,我国实行了“平垸行洪、退田还湖、移民建镇”的治水战略。
The traditional protection method have longer construction period and larger investments, however protective embankment of fabriform concrete is provided with a lot of distinguishing feature. 传统的防护方法施工周期长、投资较大,而模袋混凝土防护堤防具有施工速度快、省工、省料、技术简单、便于操作等特点。
On the Construction and Administration of Urban Flood Protective Embankment in Harbin 哈尔滨城市堤防建设及管理
In this paper, the forming of Harbin urban flood protective embankment is introduced, its present situation and problems existed in construction and administration are discussed. 本文介绍了哈尔滨城市堤防的形成、现状与存在问题;